Conservation · 2025
Phantom Footpath Trail Bridge Construction
Draper, Utah · Troop 20
This project is the construction and installation of a foot bridge on the Phantom Footpath trail in Corner Canyon, which is in Draper City. The project will provide a lasting impact for trail users, allowing an easier crossing of the drainage on the trail, especially during the Spring, when water run-off can make the trail unusable due to the water flow. Now, with the installation of the bridge, trail users can easily cross the drainage, regardless of the run-off or time of year, with the exception of Winter during heavy snowpack and cold temperatures. The project also reduces further erosion through trail use at the temporary crossing that Draper created.
View project →